
The Arrival! |

Here, the main 3 phase compressor is unloaded. |

The "Foundation" is set for the main chest. The large white
pipe is the air feed from the compressor room. |

The entire Nave is covered with pipes! |

Many are small, and arrive in cases. |

Here is one of the many pipe beds. Each hole gets a pipe installed
in it. |

The three story structure rises ! |

View of one of the pipe beds, now full. |

The main console is set up. Later, the peddles are attached. This
unit works like a giant telephone switchboard, controlling which air
valves open to sound various pipes. |

Here, one of the 16 foot pipes are installed. |

The front of the chest is not a facade, these are actual working pipes
as well. |

The completed installation ! |