Day 7: (Page 1 of 3) We collectively as a group wanted to get the Caputo’s place finished as much as we could; therefore we decided to start the last day as early as possible. This day was by far the hottest and most humid, that we had all week. By 7:30am the temp was 88 degrees and rising. We really busted our collective butts to finish the projects. We finished sealing and patching the roof, framed out the back porch, rewired a light in the ceiling, cut and put up the soffit in the overhang spaces, put up all of the T111 siding on the addition, cleaned out the entire gazebo, scrubbed out the hot tub, reattached the water lines to the hot tub, bagged all the moldy and destroyed items, and then placed them out front to be taken away by the trash (we later counted 58 bags of garbage). |
![]() |
|
|
|
|
![]() |
|
![]() |
![]() |
![]() |
![]() |
|
|
![]() |